| 1. | Core wall construction management for the auxiliary dam of the fengcheng upper reservoir 风城高库北副坝心墙施工控制 |
| 2. | Excavation technology of upper reservoir at huilong pumped storage power station in nanyang 南阳回龙抽水蓄能电站上库开挖技术 |
| 3. | Construction survey technology for upper reservoir of zhanghewan pumped storage power station 张河湾抽水蓄能电站上水库施工测量技术 |
| 4. | Embankment technology for concrete faced rockfill dam of upper reservoir of bailianhe pumped - storage power station 白莲河抽水蓄能电站上库面板堆石坝填筑技术 |
| 5. | Characteristics and evaluationof the upper reservoir of shax - imiao formation in xiaoquan gas field in west sichuan 川西孝泉气田沙溪库存组上部储层特征及评价 |
| 6. | The result shows that the leakage from the upper and lower reservoirs might occur , and that water leakage from the upper reservoir is more serious 分析表明上下、水库均存在库水外渗条件,且上水库渗漏问题比较突出。 |
| 7. | The second phase of the project can be described as the expansion of the first phase , as they have the same lower reservoir and the same upper reservoir 蒲石河抽水蓄能电站二期工程,就其工程布置及施工安排,相当于一期工程的扩建工程。 |
| 8. | With this technique , one can evaluate the oil potentiality of sandstone bodies , find out the distribution of upper reservoirs , and predict areas favorable for oil prospecting 应用该方法能够评价砂岩体含油性,上部油层的分布和进行含油有利区预测。 |
| 9. | The upper reservoir had a concrete dam 400 ft . long and 138 ft . high with a storage of 175 , 000 , 000 gallons . the dam of the lower reservoir was modified and reconstructed from that of the former tai shing paper manufacturing co . 建成后分上、下两个水塘,上塘是用混凝土筑堤坝,坝长400尺,高138尺,存水量为1 |